Kits and assemblies

How Workhorse handles kits, assemblies and shared components

Workhorse uses kits for products you pick together at despatch and assemblies for products you build and hold as finished stock. Both can draw on the same components, including parts you sell as spares. Which record you look at depends on what the customer is buying.

When to use a kit or an assembly

‍

Use a kit when sales takes the order under one item code and the warehouse picks the parts to fill it. The kit’s bill of materials (BOM) lists the products and quantities for one complete set. In the kit catalogue, Available is a count of whole kits. Check that the full set can be picked at the despatch location.

‍

Use an assembly when the workshop turns the parts into a finished item before the warehouse picks it. The assembly has its own BOM and stock record. You can raise a work order to make a batch for the shelf, even before you have a customer order. Once those units are built, sales can sell them from finished stock.

‍

How a kit order affects component stock

‍

On the kit record, Free Stock allows for kits already allocated to customers. To find out which part is holding up a kit order, check its components. Each component’s Allocated figure includes demand from customer orders for loose parts and for kits containing that part. Taking an order changes what is free to sell. The parts stay in stock until despatch.

‍

These two views show the service cover (PRT100), sold loose and in pairs inside the Maintenance Kit (KIT130). Read the figures in covers, even when the customer has ordered kits.

Service cover PRT100: 120 in stock, 112 allocated, eight free and zero on back order.

A loose order takes 112 of the 120 covers. The eight left free could supply four kits if every other part is available.

Service cover PRT100: 120 in stock, 124 allocated, zero free and four covers on back order.

An order for six kits adds demand for 12 covers. All 120 are still on the shelf, but four covers are now on back order.

‍

How a work order turns components into finished stock

‍

The workshop selects an assembly and a build quantity. Workhorse uses the BOM to calculate how many of each component the whole run needs. On the assembly record, In Production counts the units on open work orders. That lets sales distinguish the quantity due from the workshop from the finished units the warehouse already holds.

‍

When the workshop marks the work order Complete, Workhorse deducts the components and adds the finished units to assembly stock. A later despatch takes one finished assembly off the shelf for each unit shipped. The parts used to build it have already come out of component stock. If a stock count needs explaining, Product Activity shows the component and finished-stock movements.

‍

What to check before promising a shared part

‍

Before promising a finished assembly, check Free Stock on the assembly itself. In Stock includes finished units already allocated to customers. If you need the next production run to fill the order, check the work order’s required date and whether its parts are available before giving the customer a date.

‍

In our test, a standalone work order called for 100 service covers. Moving the build to In Production left all 120 covers showing as free on the component record. Before promising those covers as spares or in kits, sales still needed to check how many the workshop required and when.

‍

When the bill of materials changes with the order

‍

A standard kit or assembly can use the same component quantities each time. In2 Access makes safety edges for doors, gates and barriers in lengths specified by the customer. Its Workhorse setup calculates the lengths from the sales order and uses that order’s BOM to generate the work order. The team can quote and build a variation without creating a new product code for each length. Read the In2 Access example.

Bring a bill of materials and a recent order to a discovery call

We can show you where sales checks what is free to promise, what the warehouse will pick and what changes when the workshop completes a build.